July 2014
DROP-TARGET REBUILD
So after my little tease earlier I managed to spend a couple of hours finishing up the polishing and putting the triple drop-target bank back together.
@ronsplooter you'll be pleased to know I broke out the new reproduction drop-targets from Classics Arcades Inc. They don't look too bad out of the packet but I'm a little upset because the ones
@Gaz Shiells has are much better!
I do think the hot stamping could have been better (original left, repro right):
So, starting with a big pile of shiny bits:
I first assembled the main chassis:
The attached the reset levers to the bottom of the drop-targets with the pins and E-clips:
Drop-targets positioned into chassis in upright reset position with reset bar in place across the bottom of the chassis:
The narrow slot in the reset bar lines up with the end-plate. Shaft in position with nylon bearing and E-clip retainers:
Polished plunger with fibre links fitted with pin and E-clips:
Plunger in place on the end of the reset bar with final retaining E-clip:
Tension spring in place on the other end of the reset bar:
Tension springs pull each drop-target forward to just keep it latched on the top-plate:
Job done!!!